Year 2012

2013

2014

2015

2016

▪ INSURANCE 
▪ SECURITY 
▪ PRINTING OF NEUST YEARBOOK 2015 – 3,378 COPIES 
▪ PRINTING OF NEUST YEARBOOK 2016 – 3,335 COPIES 
▪ PREVENTION-AND-ERADICATION-OF-TERMITES 
▪ PROVISION OF_CANTILEVER_ROOFING FOODCOURT1 
▪ PROVISION OF_CANTILEVER_ROOFING FOODCOURT2 
▪ PROVISION OF_FLOOR_TILES_CEILING_CHBWALL 
▪ PROVISION OF_PARTITION 
▪ REINFORCED_CONCRETING-OF-FLOORING 
▪ RENOVATION COMFORT_ROOM-PRESIDENTS OFFICE 
▪ REPAIR CEILING_HOSTEL 
▪ REPAIR CEILING_NIETO-HALL 
▪ REPAIR OF_USG_HIGH-SCHOOL_OFFICE 
▪ REPAIR RESEARCH_EXTENSION 
▪ FACELIFTING OF ADMINISTRATION BUILDING-LTC BUILDING 
▪ PROSPOSED ACCREDITATION CENTER 
▪ PROPOSED GYMNASIUM ROOFING AND PROVISION OF GYMNASIUM STAGE 
▪ PORPOSED PERIMETER FENCING (PHASE I) 
▪ ROAD CONCRETING EARTHFILLING 
▪ PROVISION OF COVERED WALK 
▪ RENOVATION OF LINKAGE OFFICE 
▪ BRAND NEW AGRICULTURAL FARM TRACTOR with ROTAVATOR 
▪ CONSULTANCY SERVICES FOR THE ESTABLISHMENT 
▪ PAINTING OF COLLEGE OF INFORMATION AND TECHNOLOGY BLDG 
▪ PROPOSED AGRICULTURE LABORATORY BUILDING 
▪ PROPOSED COVERED WALK 
▪ PROPOSED GYMNASIUM EXTENSION, LEFT WING, PHASE II 
▪ PROPOSED GYMNASIUM EXTENSION, RIGHT WING, PHASE II 
▪ REINFORCED CONCRETING OF FLOORING CLOSED GYMNASIUM

2017

ON-GOING

—————————————————————————————————————————————-

* CLOSED *

  • REPAIR OF COMFORT ROOMS

  • REPAINTING OF CHEMISTRY LABORATORIES 

  • REPAIR OF PHYSICS LABORATORIES 

  • REPAIR OF CORRIDOR & FACULTY LOUNGE

  • REPLACEMENT OF DAMAGED STAIR THREAD

  • REHABILITATION OF CAS STUDENT CENTER

  • REPAINTING OF STAIR LOBBY WALLS & CEILING

  • PROVISION OF FACULTY TABLES

  • THREE (3) UNITS PASSENGER VAN DIESEL WITH ENGINE DISPLACEMENT NOT EXCEEDING 3,000 CC

  • SEVENTY FIVE (75) COMPUTER SETs

  • ONE (1) MULTI-PURPOSE VEHICLE (MPV) – DIESEL

  • CATERING SERVICES FOR K-12 TRAINING

  • EARTHFILLING

  • LANDSCAPING AROUND CHAPEL PHASED I

  • PROPOSED COVERED WALKED LEADING TO CHAPEL

  • PROPOSED EXTENSION OF GUARD HOUSE

  • PROPOSED PERIMETER FENCING

  • PROPOSED TRACK OVAL PERIMETER PENCING  PHASE I

  • PROVISION OF ELECTRICAL POSTS WITH LIGHTINGS

  • REPAIR OF COVERED WALK ROOFING

  • REPAIR OF GUARD HOUSE

  • REROOFING OF SCHOOL BUILDINGS

  • BRAND NEW AGRICULTURAL FARM TRACTOR WITH ROTAVATOR 4-WHEEL DRIVE SYSTEM

  • DELIVERY OF CONSUMABLES

  • PROPOSED METAL INNOVATION CENTER

  • PROPOSED MINI-CONVENTION CENTER (PHASE II)

  • PROPOSED PERIMETER FENCING (PHASE II)

  • PROPOSED PERIMETER FENCING

  • UNIT LIBRARY MANAGEMENT SOFTWARE WITH AUTOMATION ACCESSORIES

2018

2019